LED Screen
flow
08.00 AM - Chinese Service to switch on Power for LCD Panels BEFORE Service
10.30 AM - English Service to switch off Power for LCD Panels AFTER Service
05:00 PM - Chinese Service to switch on and off Power of LCD BEFORE & AFTER Service
Front led
2 front panels
lcd switches
Location - Next to the drums area
Push lever DOWN to Switch ON (will show Green Light)
** Do this one by one, wait for one screen to turn on first followed by turning on the second one **
Push lever UP to Switch OFF (No Green Light)
back led
back panel
lcd switch
Location - PA Room
Push lever DOWN to Switch ON
Push lever UP to Switch OFF
panel matrix
leave this on at all times
Do not press the on/off switch here but instead the main power at the side of the panel which is normally switched on by the PA Personal.
Also do not make any changes to the settings that has been set on this matrix.
faq
1. If front switch doesn't show green light, chances are is that the power switch is tripped.
go to the msb room
Turn off the switches in front first.
Ask Uncle Jingai for the keys to open the MSB Room situated at the back of the church.
led screen power box
Push back all the switches to the top
Turn on the front switch one by one.
2. If back LCD Panels does not turned on, check and see if the power trip or not
check this power box
Turn off the LED Panel Switch
Push back up the Trip Switch
Turn back on the LED Panel
3. Screen On No Display
Check the signal
Check which Win 1,2 or 3 has lost the signal. In this case Win 1 and Win 3 has no signal. So we need to change the source.
change the source
Select Win 1 from the Menu Section and Select HDMI 2
Select Win 3 from the Menu Section and Select HDMI 2
This will enable the screen back up based on whichever signal is up.